Zc Zr On Boiler

Product thermal capacity: 4-35 t/h
Working pressure: 1.0-2.5 MPA
Outlet temperature:: 184-350 ℃
Available fuel: Bituminous coal, lean coal, anthracite
Available industries: Heating, chemical, food, tobacco, textile, print and dyeing, feed, medicine, building materials, wine, hospital

>SR506 IN SH W/FUSES (102-165) - Swee

SR506 IN SH W/FUSES (102-165) - Sweets

ZR. Connect terminal ZC to ZC on the aquastat control. Connect ter-minal ZR to ZR on the aquastat control. Confirm polarity is consistent between boiler aquastat and switching relay. Power Input:Connect 120 volt ac power input to terminals N and H. Neutral wire to terminal N. Hot wire to terminal H. Cold Start Boiler Application:

Get A Quote

ZoneTrol Zone Pump Controller Models ZT-2, ZT-3, ZT-

ZoneTrol Zone Pump Controller Models ZT-2, ZT-3, ZT-4

2013-10-10 · If boiler temperatures drop below the low limit setting, all circulators will cease operation until the low limit temperature of the boiler is satisfied. 1) A factory installed jumper is connected between the ZC/ZR terminals. Remove the jumper. 2) Connect the ZC/ZR terminals to the corresponding ZC/ZR terminals on the boiler aquastat.

Get A Quote

>Hydrolevel 3150 : Owner's manu

Hydrolevel 3150 : Owner's manual

Get Hydrolevel 3150 Owner's manual. Get all Hydrolevel manuals! ManualShelf the circulator (C1/C2 contacts) on calls to TT. The control can be programmed to activate the circulator on calls to ZC/ZR in place of, or in addition to, calls to TT. To change how the Circulator is activated 1. TEMP HIGH TEMP Illuminates when the boiler water

Get A Quote

>SR504-EXP-4 Switching Rel

SR504-EXP-4 Switching Relay

2018-12-13 · ZC and ZR Terminals: Connect terminal ZC to ZC terminal on the aqua - stat control. Connect ZR to ZR terminal on the aquastat control. Confirm polarity is consistent between boiler aquastat and switching relay. WARNING: When using Alternative Wiring diagram, wiring instruc - tions must be followed so power originates from the boiler aquastat.

Get A Quote

>Wireless Pump Relay Controllers - SALUS

Wireless Pump Relay Controllers - SALUS NA

2019-1-21 · • ZC/ZR boiler enable support • Wireless boiler XX support with a ZigBee Receiver (AX10RF) • XX and AUX normally open contacts support • Master / Slave function for up to 5 units (1 master / 4 slaves) • External Antenna for sheltered locations • LED indicators for zones and other status • 3 models: AKL01PRF – single zone

Get A Quote

>Hydrolevel 3250-Plus User Manual | Page 13 /

Hydrolevel 3250-Plus User Manual | Page 13 / 16

(ZC-ZR) Calling. for Heat? NO. Is the. Low Limit Dial . Set to OFF? YES. NO. YES. Is the. Red LED (LOW WATER) On? The Control is. Sensing. Low Water. CAUTION – ALWAYS ALLOW A BOILER TO COOL BEFORE ADDING WATER. The burner will not fire until the low water condition is satisfied. ̈ Check that the system is filled with water.

Get A Quote

>Quick Taco SR502 switching relay questio

Quick Taco SR502 switching relay questions

2017-3-30 · The ZC ZR circuit is for integrating with a separate aquastat based boiler/pump control - like a Honeywell L841 I think. Essentially 120 v needs to be on ZR or the zone pumps wont run. Anyway, there not really common anymore. The 6 amp fuses are in series with the individual zone pumps they feed power too. Sent from my iPhone using Tapatalk

Get A Quote

>WIRING GUIDE - Calef

WIRING GUIDE - Caleffi

2014-6-2 · WIRING GUIDE 4009064 Certified to CSA C22-2 No.24 Conforms to UL Standard 873 The ZSR101 is a versatile single relay control with two outputs for operating a 120 VAC pump with boiler enable, or two 120

Get A Quote

>TACO ZONE CONTROLS WIRING GUI

TACO ZONE CONTROLS WIRING GUIDE

2019-2-4 · zc zr x x end switch zone4 power input sr 504 power zone 1 zone 2 zone 3 zone 4 t t t boiler zone 4 on off priority y fuse 1 amp 24 vac power zone 4 120 vac input to: "tt" on boiler tors zc zr x x end switch zone4 power input sr 504 power zone 1 zone 2 zone 3 zone 4 t t t h n a sr 503 zone3 c power fuse 1 amp zone3 n p zc h x zr jumper 1 x 2

Get A Quote

>INSTALLATION MANUAL AND OPERATING INSTRUCTIO

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

2016-10-24 · installation manual and operating instructions. argo ar series controls. ar822-ii, ar861-2ii, ar861-3ii. p/n 240005122, rev. a 06/08 an iso 9001-2000 certified company

Get A Quote

>Z-ONE SERIES ZONE CONTROLS Z-ONE RELAYS - Calef

Z-ONE SERIES ZONE CONTROLS Z-ONE RELAYS - Caleffi

2017-4-11 · boiler of a heating demand. Zone 1 can be used for priority by positioning the Priority dip switch to ON, a demand from T-Stat 1 will activate priority pump 1 and all other zones will be switched OFF, plus DHW (ZR/ZC dry contact rated to switch max 120 VAC, 2A) will close during priority. Depending on Primary pump

Get A Quote
Contact us
Tel

0086-510-68530066

Chat online

Online message


Gas-fired(oil-fired) boilers
Coal-fired boilers
Biomass-fired boilers
Thermal oil heaters
Hot water:0.7-14 MW
14.1-21 MW
21.1-29 MW
29.1-75 MW
Steam :  1-10 t/h
11-20 t/h
21-90 t/h
91-140 t/h